Location: Play House Theatre, London

We undertook the complete installation of a new boosted cold water supply comprising of a new cold water storage tank and variable speed booster pump set.

 

The new system was located on the ground floor at the rear of the building, the new main riser was installed on the outside of the building to roof level where it connected into the existing down service pipes from the old roof level storage tanks. All works were undertaken whilst the building, which consisted of a theatre, offices and residential units remained in continuous use. Special care in planning was taken to ensure minimal down time during the change over period.

 

The works were completed to the full satisfaction of the client and associated stakeholders. We were on time and within budget. £110K